Tuesday
- June 9th |
Wednesday
- June 10th |
Thursday
- June 11th |
|
2009
|
Track 1 |
Track 2 |
Track 3 |
Track 1 |
Track 2 |
Track 3 |
Track 1 |
Track 2 |
Track 3 |
|
7:00-8:00 |
Registration
(coffee and pastries served) |
Registration
(coffee and pastries served) |
Attendance Certificates Distributed
(coffee and pastries served) |
|
8:00-8:30 |
Keynote
(in Track 1 Room)
Glenn Baker
Director of Engineering, Technology and Quality Services
Deere & Company
|
T1-S9
Tools, Tips and Techniques for Making the Most Positive Impact
Throughout Your Organization (Even with a Reliability Department
of One)Marty Fox
Hologic, Inc.
|
T2-S9
Reliability Design of Pressurized Structural Devices Under
Cycling Load
Julio Pulido
Ingersoll-Rand
|
T3-S9
High Reliability System COTS Integration: Failure Case Studies
and Risk Assessment Strategies
Aaron C. DerMarderosian Jr.
Raytheon Company
|
|
8:30-9:00 |
Welcome
(in Track 1 Room) |
|
9:00-9:10 |
10
Minute Break
|
|
9:10-10:10 |
T1-S1
Selecting the Correct Accelerated Life Model
Dave Olwell
Naval Postgraduate School
|
T2-S1
COTS Parts and HALT as Applied to the Tactical Tomahawk
MissileTerry Tracy
Raytheon Missile Systems |
T3-S1
Complex System Reliability with Imperfect Fault Coverage
Albert
Myers
Myers Consulting
Northrop Grumman (Retired)
|
T1-S5
Experiment Design for Engineers and Scientists: Additional Support
Tools for Accurate Decisions
Larry Gonzales
Raytheon Corporation
|
T2-S5
How Statistical Modeling of Field Reliability Failures Guided
Efforts on Problem Resolution
David C. Trindade
Sun Microsystems, Inc.
|
T3-S5
Reliability and Availability Analysis of a Fielded Photovoltaic System
Michael Mundt
Sandia National Laboratories
|
T1-S10
Sub-Tier Supplier Management: Notebook Hinge Case Study
Nathan Drees
Dell, Inc.
|
T2-S10
Making Conservative Estimates of Demonstrable Reliability When
Model Parameters Are Unknown
Shawn P. Capser
AVL Powertrain Engineering
|
T3-S10
A Methodology for Predicting Operational Reliability Growth for a
Complex Multi-stage System
Jennifer L. Nicholls
United States Navy
|
|
10:10-10:30 |
20 Minute Break
|
|
10:30-11:30 |
T1-S2
Design for Reliability: Workbench Enterprise Solution and
Collaborative Portal
Kaizad P. Sunavala
Chevron Global Manufacturing |
T2-S2
Improving Organization Competitiveness: How Quantitative Accelerated Life
Testing Can Present a Value Proposition
Mark Turner
Flextronics Medical Systems |
T3-S2
Successful Application of Reliability Centered Maintenance to
Semiconductor Equipment
John Mao
Intel Corporation
|
T1-S6
Calibrated Accelerated Life Test with Time Varying Stress Profiles to Verify
Product Reliability Requirements
John J. Paschkewitz
Watlow
|
T2-S6
Reliability Performance and Metrics of Repairable Systems
Wendai Wang
Applied Materials
|
T3-S6
An Effective Reliability Program to Successfully Fulfill Contractual
Reliability Requirements
Richard Coronado
Lockheed Martin
|
T1-S11
This session has been cancelled. The scheduled presenters
were unable to attend the Symposium.
|
T2-S11
The Application of a Residual Risk Evaluation Technique Used for
Expendable Launch Vehicles
John A. Latimer
Science Applications
International Corporation (SAIC)
Kennedy Space Center
|
T3-S11
Solder-Joint Reliability…Requirements, Predictions, and Qualification
Tom Clifford
TJB Associates
Lockheed Martin (Retired)
|
|
11:30-1:00
|
1 Hour 30 Minute
Lunch Break
|
|
1:00-2:00 |
T1-S3
Air Force Flight Test Center Coding and Characterization
of R&M Data
David C. Witteried
United States Air Force Flight Test Center
|
T2-S3
A Maintenance Data-Driven Reliability Analysis and Knowledge Discovery
ApproachAssaad Krichene
Impact Technologies
|
T3-S3
Implementing the Materiel Availability KPP in DoD Acquisition
Programs: Balancing Life-Cycle Costs with Warfighter Needs
Grant Schmieder
Department of Defense
|
T1-S7
Developing a Better Reliability Test Program
Mike Silverman
Ops A La Carte
|
T2-S7
Reliability Assessment of a New Aircraft Belt Loader
Jose Oviedo
JBT AeroTech
|
T3-S7
Predicting and Managing the Safety and Reliability of Modern
Technological SystemsRomney
B. Duffey
Atomic Energy of Canada Limited (AECL)
|
T1-S12
Software Reliability Assessment: Achievements and Challenges
William H. Farr
Naval Surface Warfare Center
|
T2-S12
Integrated Hardware, Software and Procedures System Availability
ModelPhilip L. Scarff
Alcatel-Lucent
|
T3-S12
Reducing Warranty Costs Through Customer-Triggered Product Evolution
John A. Kolb
Proliance International, Inc.
|
|
2:00-2:20 |
20 Minute Break
|
|
2:20-3:20 |
T1-S4
Reliability Goal Setting and Validation at John Deere
Chuck Noel
Deere & Company
|
T2-S4
Reliability Plan for Medical Devices
Kenneth B. Schmidt
OPTIM Associates, Inc.
|
T3-S4
Process Flow Diagram: The Foundation of PFMEA
James Davis
General Dynamics Amphibious Systems
|
T1-S8
Design For Reliability Methodology to Achieve Reliability Growth that Meets New
Guidelines
Dmitry Tananko
General Dynamics Land Systems
|
T2-S8
Reliability Maturity Assessment Lessons Learned
Andrew Foote
Alion Science and Technology Corporation
|
T3-S8
Estimating Probabilities of Rare Events Using Limited Data
Paul Franklin
Arup
|
T1-S13
Reliability of Complex Electronic Systems for Space
Exploration Vehicles
Vladimir Crk
Hamilton Sunstrand
|
T2-S13
Determining Optimum Times for Running Standby Equipment
Lynn Long
Chevron Energy Technology Company
|
T3-S13
Collection, Analysis and Use of Fielded Systems Reliability
Information in Development of Next Generation Products
Robert A. Merrill
Ortho Clinical Diagnostics
(a Johnson & Johnson Company)
|
|
3:20-3:30 |
10 Minute Break
|
|
3:30-5:00 |
T1-T1
An Introduction to Design for ReliabilityPantelis
Vassiliou
ReliaSoft Corporation
|
T2-T1
Building Blocks of an Accelerated Life Testing Program
Harland MacKenzie
Dana - Thermal Products
Canada
|
|
T1-T2
Fundamentals of Life Data Analysis Concepts and Applications
Adamantios Mettas
ReliaSoft Corporation
|
T2-T2
DOE for Reliability Prediction and Product Performance Optimization
Allise Wachs
Integral Concepts, Inc.
|
|
|
T2-T3
Recent Advances in HALT and HASS Techniques and EquipmentGregg
K. Hobbs
Hobbs Engineering Corporation
|
T3-T3
Application Lessons for Effective FMEAs
Carl Carlson
ReliaSoft Corporation
|
|
5:00-6:30 |
|
|
|
|
|
|
|
|
|
|
6:30-9:00 |
|
Hosted
Awards Dinner
(for attendee and a guest)
|