|
Wednesday - June
5th |
Thursday - June
6th |
| 2013
|
Blue Room |
Red Room |
Blue Room |
Red Room |
| 7:00-8:00 |
Registration and Check-in (Check-in also
offered
on Tuesday from 4 - 7 p.m.)
Continental breakfast available. |
Continental breakfast available. |
| 8:00-8:30 |
Blue-S7
Design for Reliability (DFR): Key Process Elements and
the Application of Reliability Demonstration Tests
Within the DFR Process
Richard B. Ramirez ViaSat Corporation |
Red-S7
Practical Applications of the Three-Parameter Weibull
Tom Ryan Rolls-Royce
|
| 8:30-9:00 |
Welcome Address (in
the New Century Theatre Room) |
| 9:00-9:15 |
15 Minute Break |
| 9:15-10:15 |
Blue-S1
Integrate FMEA into Firmware Test Plan Development
Keyanna Qi Research Products Corporation
|
Red-S1
FRACAS - The Key to A Dynamic Reliability Program
Keith M. Janasak Raytheon Company
|
Blue-S8
Integrated FMEAs – A Key to Organizational Efficiency
John Gebhard Rolls-Royce
|
Red-S8
Improvement of Electrical Submersible Pump Optimization
and Reliability Using Cox Proportional Hazard (PH) Model
for Time-Dependent Data
K.C. Snyder Baker
Hughes Incorporated
|
| 10:15-10:30 |
15 Minute Break |
| 10:30-11:30 |
Blue-S2
Relianomics: Changing the Mindset and Units of Measure
for Reliability
Stan Stephenson Halliburton
|
Red-S2
A One-Off Design with a World Class Maintenance Strategy
John Holmes Mainnovation
|
Blue-S9
Failure is ALWAYS an Option
Harland MacKenzie
Dana - Power Technology Group
|
Red-S9
Integrated Logistics Support - Processes and Applications
Richard Coronado Reliable Systems Solutions
|
| 11:30-1:00 |
1 Hour 30 Minute Lunch Break
|
| 1:00-2:00 |
Blue-S3
Highly Accelerated Life Testing (HALT) – An Effective
Tool for Streamlining Reliability Program Processes and
Reducing Costs
Christopher Laplante
Qualmark Corporation
|
Red-S3
The Applications of Reliability Growth on Hybrid Drive
Systems
Tajure Nemu Parker Hannifin
|
Blue-S10
Continuous Assessment Using an Integrated Data
Management System
Andrew Foote Alion
Science and Technology Corporation
|
Red-S10
Design for Reliability at the Board Level
Randy
Schueller DfR Solutions
|
| 2:00-2:15 |
15 Minute Break |
| 2:15-3:15 |
Blue-S4
Exploring a Scalable Field Reliability Management
System: Roles, Tools and Processes to Support 2,500%
Fielded Product Growth
Georgios Sarakakis
Tesla Motors
|
Red-S4
Assessing Reliability in a Competitive DoD Procurement
D. David Dylis Alion Science and Technology Corporation |
Blue-S11
Applying Accelerated Testing in Lean New Product
Development
John J. Paschkewitz Watlow |
Red-S11
Accelerated Life Test Guide Lines
Amnon Ganot Orbotech Ltd. |
| 3:15-3:30 |
15 Minute Break |
| 3:30-4:30 |
Blue-S5
Influencing Project Genetics: Reliability Before Design
Mike Silverman Ops A La Carte |
Red-S5
Combinatorial Testing for a Complex Medical Device: A
Case Study
Bart Chase GE Healthcare
|
Blue-S12
Success is Around the Corner with Design for Reliability
Dev Raheja Raheja Consulting, Inc.
|
Red-S12
Developing a Reliability Test Using Product Performance Data
Rahul K. Rajgarhia Boston Scientific Corporation
|
| 4:30-4:45 |
15 Minute Break |
| 4:45-5:45 |
Blue-S6 Design for Reliability Criticality
When Developing New
Technology and Entering a New Market
Dane Rodgers
Allison Transmission, Inc.
|
Red-S6 Reliability Data—Analysis vs. Plug and Chug
Elizabeth Baker Coherent, Inc.
|
Tutorial 1 (4:45 to 6:00) Determining the Right Sample Sizes for Your Test:
Theory and Application
Ed Pohl University of Arkansas |
| 5:45 - 6:00 |
|
| 6:00 - 6:30 |
Welcome Reception
(6:00 to 7:00)
|
|
| 6:30 - 7:00 |
Hosted Dinner
(Cocktails 6:30 to 7:00, Dinner 7:00 to 9:00) |
| 7:00-9:00 |
|