|
|
Wednesday -
October 22nd |
Thursday -
October 23rd |
|
2008 |
Track 1 |
Track 2 |
Track 1 |
Track 2 |
|
7:30-8:00 |
Registration |
Registration |
|
8:00-8:30 |
T1-S5
Using Software Failure Analysis to Drive Fault Tolerance
Implementations
George de la Fuente
George de la Fuente Engineering Solutions |
T2-S5
Compressor Reliability Growth
Ibrahim Asiri
Saudi Aramco
|
|
8:30-9:00 |
Welcome
(in Track 1 Room) |
|
9:00-9:10 |
10 Minute Break |
|
9:10-10:10 |
T1-S1
A Template for Rapid Component Life Data Analysis in the
Airline Industry
Tony Steer
Air New Zealand Technical Operations |
T2-S1
Supplier Quality and Reliability Development in Integrated
Circuit (IC) Packaging of Multi-layered Leadframes
Randolph E. Flauta
NXP Semiconductors
|
T1-S6
Managing QAQC in Plant Turn Around
M Sahrul B Harun
MTBE Malaysia Sdn Bhd
|
T2-S6
Reliability Prediction During Design and Development Cycle
Serene Tay Poh Choo
Advanced Material Engineering Pte Ltd
|
|
10:10-10:30 |
20 Minute Break |
|
10:30-11:30 |
T1-S2
Cost-Benefit Analysis of the Tram Rolling Stock
Vladimir M. Popovic
University of Belgrade |
T2-S2
Use of IEC 61508 in Connection with Digital System FMEA
Woojune Yi
Korea Reliability Technology Service, Inc. |
T1-S7
Multi-level Hierarchical Modelling Framework Concept for
Mixture Scheduling of Preventive and Corrective Maintenance
Sakon Wongmongkolrit
Kasetsart University |
T2-S7
Data Requirements: What to collect and for whom?
Alex Smithers
Imes Australia Pty Ltd
|
|
11:30-1:00 |
1 Hour 30 Minute Lunch Break |
|
1:00-2:00 |
T1-S3
Trapped by MTBF - A Study of Alternate Reliability Metrics
Fred Schenkelberg
Ops A La Carte
|
T2-S3
Reliability Evaluation of Radial Distribution System Using a
Modified Analytical Simulation Technique
Muhyaddin J. Rawa
Saudi Electricity Company |
T1-S8
Transition from Reliability Engineering to Reliability
Management
G. Sundararaman
JCB India Limited |
T2-S8
Instrument Reliability Improvement Program, Gas Processing
Plant, PETRONAS Gas Bhd
M Nizar B A Khadir
PETRONAS Gas Bhd
|
|
2:00-2:10 |
10
Minute Break |
|
2:10-3:10 |
T1-S4
The Effectiveness of Using AHP in Supplier Management
Strategic Activities
Mohamed F. El-Nassery
Mantrac Unatrac Group - Caterpillar Dealer |
T2-S4
Use Forward Voltage Drop to Monitor Semiconductor Junction Temperature During Reliability Testing
EY Siew
ISO Technology Sdn. Bhd. |
T1-S9
From Blue Sky To Green Field And Beyond
Geoff Savage
Phu Bia Mining Limited |
T2-S9
Applying the Component Stress Test (CST) Automation
Methodology and Deming’s PDCA Cycle Methodology to the Design of
System Boards for TFT-LCD Reliability
Ming-Lang Tai
Chunghwa Picture Tubes,
LTD.
|
|
3:10-3:30 |
20
Minute Break |
|
3:30-5:00 |
Tutorial 1
Developing a Reliability Centered Culture
Julio Pulido
Ingersoll Rand |
Tutorial
2
Application Lessons for Effective FMEAs
Carl Carlson
ReliaSoft Corporation |